2022 - AVEVA PI World Amsterdam - Power Generation
Digitization and the pursuit of excellence - Enerjisa Üretim
SENKRON is the central control room which is established at stanbul Ata ehir Headquarter. The remote operation process of 12 hydroelectric power plants within Enerjisa Üretim started on 16 Nov 2020. In addition to the remote operation of hydroelectric power plants, "SENKRON" includes the control systems of Thermal, Wind and Solar power plants and carries out process monitoring. With Senkron, 12 different power plants are controlled from a single center. With multiple facility management, the sustainability of energy production is ensured by increasing the performance of the plants and with maximum efficiency. Assets are managed with hourly planning in dynamic market conditions by minimizing energy costs. Thanks to close communication with Dispatch, rapid action is provided to the productions likely to create imbalance. With common reporting, the data of the power plants are monitored from a single source by using PI System features such as PI Integrator, System Explorer, Vision.
Company
Enerjisa Üretim
Speaker
Emin ahin
I joined Enerjisa Üretim in 2018 as a Mechanical Engineer.
I am responsible for power plant performance monitoring and development in the central main control room,Senkron.
Senkron controls the renewable asset of the portfolio of the Enerjisa Üretim.
I have 12 years experience, 11 of ir in the energy sector.
Company
Enerjisa Üretim
Speaker
Kuzey Bener
He graduated from Sabanc University Mechatronics Engineering in 2019.
Joined Enerjisa Üretim as t Trainee Engineer. He is responsible for monitoring power plants using IT driven tools instantly. He is actively using p system explorer , PI Vision, P Integrator to create dashboards, alarms to assist the plant operation.